Apedia

Ve Elektrik Intended Synchronise Operations Albanian Montenegrin Power

Front It is intended to synchronise operations of the Albanian and Montenegrin power systems , as well as contributing to the overall strength and flexibility of electricity networks in Southeastern Europe .
Back Projede , Arnavutluk ve Karadağ elektrik sistemlerinin işleyişlerinin eşzamanlı hale getirilmesinin yanı sıra , Güneydoğu Avrupa' daki elektrik ağlarının genel güç ve esnekliğine katkıda bulunulması amaçlanıyor .

Tags: 35turquie, turquie

Learn with these flashcards. Click next, previous, or up to navigate to more flashcards for this subject.

Next card: Side tarafı kilometre line 200km long albanian 27km

Previous card: Ebrd kfw power line project expected cost 80m

Up to card list: Turkish-English 21000